top of page

Local University

Los Angeles, Ca

Retrofit was on site at a local university to remove and replace their chiller and connect it to the existing CHW and CW piping. Our team received the chiller in our yard to disassemble and transport it to the job site. Once at the job site, we rigged the equipment into the chiller room and assisted in re-assembling it. Photographs show the arrival of the chiller at our shop, crane day, the removal of the existing equipment, and the installation of the new system.

bottom of page